News Flash Home
The original item was published from 8/28/2017 12:55:00 PM to 10/24/2017 9:32:03 AM.

News Flash

Home - News & Announcements

Posted on: July 17, 2017

[ARCHIVED] Town of East Greenwich Road Paving

Image of 1939 Main Street

TOWN OF EAST GREENWICH ROAD PAVING

Road Paving Bond initiative - for a map and details of the roads that are scheduled to be repaired with the taxpayer approved bond please see the links below

The following streets were scheduled to be paved during the summer and fall months:

  • Middle Road – Paving on Middle Road is complete for this year.  Grading along the edge of the road and pavement striping are completed.
  • Somerset Street –   There is concrete sidewalk and curb the full length of the south side of the street, and curb along the north side.  The road was milled and re-paved.
  • Spring Street – The Town installed or repaired curb on both sides of the road from Main Street up to the driveway for Swift Gym.  From there, there is concrete sidewalk on the south side of the road up to Kenyon Ave, and curb on both sides.  The entire length of Spring Street was re-paved.

Facebook Twitter Email